Maintenance & Alerts
Monitor machine health and manage predictive maintenance
Critical Alerts
Requires immediate action
Warnings
Review soon
Information
For awareness
Active Alerts
CNC-03
Power Factor CriticalPF: 0.67 (Target: >0.90)
Press-12
Abnormal Power Pattern52.8kW (vs avg 45.2kW)
Lathe-07
Extended Idle Time47 minutes idle
Mill-09
High Temperature73°C (normal: 65-70°C)
Weld-13
Phase ImbalanceL1: 32A, L2: 28A, L3: 25A
CNC-04
Maintenance DueNext PM: Jan 15
Lathe-06
Operating Hours MilestoneReached 500 hours
Weld-15
Scheduled MaintenanceOffline for service
Predictive Maintenance Schedule
| Machine | Status | Op. Hours | Next PM Due | Health Score | Priority |
|---|---|---|---|---|---|
| CNC-03 | 🔴 OVERDUE | 2,847h | OVERDUE | 62% | 1-Critical |
| Lathe-07 | 🟡 Due Soon | 3,124h | 7 days | 71% | 2-High |
| Press-12 | 🟡 Due Soon | 1,956h | 14 days | 68% | 3-High |
| Mill-09 | 🔵 Scheduled | 2,234h | 21 days | 88% | 5-Medium |
| Weld-13 | 🔵 Scheduled | 1,678h | 28 days | 82% | 6-Normal |
| CNC-01 | 🟢 Good | 2,456h | 35 days | 91% | 8-Normal |
| Lathe-08 | 🟢 Good | 2,892h | 42 days | 89% | 9-Good |
| Mill-10 | 🟢 Good | 1,823h | 49 days | 94% | 10-Good |
Power Quality Monitoring
Overall Power Quality
80/100
⚠️ Action Required: Improve Power Factor to >90% to avoid penalties
Anomaly Detection
Press-12
HIGHPower Consumption Spike
🔍 Detected: 6 hours ago
📊 Deviation: +15% above baseline
✅ Inspect tooling and review job specifications
CNC-03
HIGHPower Factor Degradation
🔍 Detected: 2 days ago
📊 Deviation: PF dropped from 0.89 to 0.67
✅ Check motor windings and install capacitor bank
Mill-09
MEDIUMTemperature Increase
🔍 Detected: 4 hours ago
📊 Deviation: +8°C above normal
✅ Verify cooling system and check bearing condition