Financial Dashboard
Track costs, savings, and ROI
Total Cost MTD
$28,456
$2,341 (6.2%)vs last month
Cost / Hour
$18.42
$1.23 (6%)vs last month
Demand Charges
$4,823
$412 (9%)⚠️ Watch
Cost / Part
$3.67
$0.18 (5%)Improving
Projected MTD
$34,200
of $35,000
Budget Status
76%
$8,544 Remaining
✅ On TrackCost Breakdown
Base Energy
$18,234(64%)
Demand Charges
$4,823(17%)
Peak Penalties
$2,156(8%)
Off-Peak Discount
$756(-3%)
Surcharges
$3,999(14%)
Total$28,456
Cost by Machine Type
CNC Mills$9,234
Lathes$4,567
Presses$8,923
Welding$5,732
Monthly Cost Trend
Actual Cost
Budget
12-month savings: $23,450
Average savings: 7.8% per month
Peak Demand Analysis
6AM12PM6PM12AM
🔴 Peak:3:15 PM - 987 kW
Threshold:900 kW
Savings Opportunities
Load Shifting
$780/moMove high-energy operations to off-peak hours
Power Factor Correction
$340/moInstall capacitors to improve power factor
Idle Time Reduction
$520/moOptimize scheduling to reduce idle machine time
Total Opportunity:$1,640/mo
ROI Tracker - FabricateIQ System
System Cost
$45,000
Installed 8 months ago
Cumulative Savings
$28,450
Monthly avg: $3,556
Payback Progress
63%
Est. 12.7 months total
Progress$28,450 / $45,000
✅ On track to reach payback in 12.7 months (Target: 18 months)